Torque Transfer System - TTS
Torque Transfer System - TTS

The Torque Transfer System (TTS) was fabricated and tested at our premises. The complete TTS has been installed on the FPSO BW Opal, which will be operated by BW Offshore.

Gearbox for Visund semi-sub rig
Gearbox for Visund semi-sub rig

Newbuilt of two gearboxes for the Visund semi-sub rig. Original design from the 90`s. A digital model was engineered to optimize the entire fabrication process, ensuring enhanced efficiency, precision, and cost-effectiveness throughout the process.

  1. Fabrication engineering & documentation
  2. Procurement
  3. Machining
  4. Welding
  5. Assembly
  6. Testing
“Spiderman” - Autonomous crawler
“Spiderman” - Autonomous crawler

Panterra was awarded the task of developing and fabricating an autonomous robot for crawling inside structures for inspection and welding. The crawler can be carried through a manhole, then extended to fit within circular or square pipes of up to Ø2.8m.

  1. Research and development
  2. Fabrication engineering
  3. Procurement
  4. Fabrication
  5. HMI and logic (Beckhoff PLS)
  6. Assembly
  7. Testing
  8. Documentation
PIG Receive & Launcher
PIG Launch & Receiver

Panterra was awarded the task of designing and fabricating 4x pig-receivers on behalf of APL Norway for delivery to Reliance Ruby FPSO. Design code PD5500 with ABS Class follow-up and design approval.

  1. Design Pressure: 495 bar
  2. Test Pressure: 742 bar
  3. PD5500 Design Class
  4. ABS Product Design Approval
  5. Robotic welding
CANLock 500 - Locking Mechanism
CANLock 500 - Locking mechanism

This 500 ton locking mechanism, designed by Can Systems and BW Offshore, represents a significant innovation in offshore engineering. A locking mechanism designed to engage and disengage easily, facilitating quick deployment and retrieval of subsea buoys.

  1. Successfully tested at 750 tonnes
Subsea Skid & Baskts
Subsea ACS Basket & ACC Skid

Subsea accumulator skid and baskets for the Hebron SAL project. These skids ensure reliable control and safety of connected subsea equipments.

  1. Fabrication engineering & documentation
  2. Procurement
  3. Machining
  4. Welding
  5. Assembly
  6. Testing
Subsea HUB Connector
Subsea HUB Conncetor

Fabrication and overlay welding of 6“ SeaAlign connector HUB for Subsea Design. Fabricated according to DNVGL-RP-B204 Welding of subsea production system equipment.

  1. 6" range
  2. F65 Inconel 625 cladding inside and outside flanges
  3. API 10K HUB